Generator installation
From survey to commissioning: a clean, safe and documented installation.
A reliable generator starts with a proper installation. MTmaxPower carries out turnkey installation: site visit, sizing, location and ventilation, concrete base, connection to the switchboard, automatic transfer switch (ATS), commissioning and load testing.
We take Mauritania’s conditions into account: heat, sand and salty air on the coast. Every installation is followed by a handover of documents and a maintenance schedule.
- Technical visit and load survey
- Concrete base, shelter or soundproof canopy depending on the site
- Electrical connection, protections and automatic transfer switch (ATS)
- Commissioning, load testing and user training
- Service contract with a report after every intervention
Generators available in Nouakchott
Frequently asked questions
How long does an installation take?
It depends on the site and the power; the lead time is stated in the quote after the technical visit.
Do I need an automatic transfer switch (ATS)?
Recommended whenever the generator must take over from the grid automatically (hotel, clinic, laboratory, cold room).
Do you install outside Nouakchott?
Yes, throughout Mauritania; transport and travel are priced in the quote.
